AvRegs Canada

← Canadian Aviation Regulations

History — 702.95

Every captured version of this section, newest first. Word-level diffs show exactly what each amendment changed. Read the current text →

FIRST SEENsnapshot of 2026-03-01 · consolidation amended to 2025-12-09
Text as first captured
702.95 If a flight crew member is notified of a delay in reporting time before leaving a rest facility and the delay is in excess of three hours, the member’s flight duty period is considered to have begun three hours after the original reporting time. SOR/2018-269, s. 14